|
Site Survey...
The engineering site survey is about saving money. Contact the inking
system experts of CGI to initiate an on-site engineering survey to
determine solutions to any of your inking problems, and identify process
waste which can be eliminated. The professional engineering staff of CGI
will design a conversion solution utilizing patented CGI digital injectors
and ink train efficiencies. A no-obligation site survey will answer all of
your questions concerning your ink delivery technology of today, and
tomorrow. The CGI engineering staff will blend leading edge technologies
with precision mechanical design to achieve the most cost effective,
forward thinking ink delivery system for your production facility.
See for yourself the benefits of CGI's "Total Solution
Engineering", the turnkey approach to inking system upgrades. The
type of equipment you run, the method of ink delivery you use, and the
results you achieve with your present system will all be analyzed with an
eye towards reduction of waste, reduction of overall press staff labor,
decreasing run times, and increasing yield. CGI staff will examine the
entire inking system and make recommendations on each portion to achieve
an integrated, efficient digital ink production system. We examine your
press to determine the best possible upgrade path and the most cost
efficient means to achieve it. We have dealt with low and high speed
roller systems, keyless systems, open fountain as well as pump and rail
systems the world over. CGI's engineers can design a drop-in cartridge
with all needed rollers, rails, and digital ink injectors to fit any make
or model system, of any vintage. Electrical requirements and signal cable
routing is then determined as well as placement of any desired local
controls. Unit fascia are examined for seamless placement of local
keyboard control modules should a local control station be desired. A
suitable press speed reference is chosen and routing for these cables is
then considered.
If CGI consoles are to be used, locations and wiring for these units is
determined next. We also consider what other interface and control
responsibilities we have in terms of ancillary equipment such as
dampeners, and compensators. If press control consoles of another
manufacturer are to be utilized, we determine interface requirements at
both the hardware and software level and plan accordingly, specifying
interface boxes and protocol converters as needed.
Upon completion of the site survey, the CGI Total Solution Team will
contact you to set up a time when they can present and explain the
proposal which will include a complete site assessment, a customer list,
solution proposal, support documentation and drawings, a
Return-On-Investment analysis, a statement of warranty, and a pricing
sheet. In addition, various forms of multimedia will be employed during
the presentation to better explain the new digital technology and the
reasons behind the proposed solutions.
To inquire about a site survey for your facility, follow this link, site
survey and fill out the short email form and send to CGI. A company
representative will call within 48 hours to initiate the process.
|